- Graham, R.L., et al., (1979) Optimization and Approximation in Deterministic Sequencing and Schedul-ing: a Survey. Annals of Discrete Mathematics,. 5: p. 287-326. https://doi.org/10.1016/S0167-5060(08)70356-X
- Pinedo, M.L., (2008) Scheduling, Theory, Algorithms, and Systems, in Scheduling., Springer-Verlag New York: New York ; London : Springer,. p. XX, 676.
- Kalantari, , Rabbani, M,. Ebadian, M,. (2011) A decision support system for order acceptance/rejection in hybrid MTS/MTO produc-tion systems, Applied Mathematical Modelling 35: 1363-1377. https://doi.org/10.1016/j.apm.2010.09.015
- McNaughton, R., Scheduling with Deadlines and Loss Functions. Management Science, 1959. 6(1): p. 1-12. https://doi.org/10.1287/mnsc.6.1.1
- Hall, N., (1986). Single and multi-processor models for minimizing completion timevariance, Naval Researche Logistics Quaterly, Vol. 33, 49-54 https://doi.org/10.1002/nav.3800330105
- Yang Cheng, Ch., Wei Huang, L. (2017) Minimizing total earliness and tardiness through unrelated parallel machine scheduling using distributed release time control. Journal of Manufacturing Systems, Volume 42., Pages 1-10. https://doi.org/10.1016/j.jmsy.2016.10.005
- عطایی، حشمتالله. احمدیزر، فردین. ارکات، جمال (1400). زمانبندی ماشینهای موازی یکسان با درنظر گرفتن عملیات مشترک بهمنظور کمینه نمودن مجموع انرژیهای مصرفی و مجموع زمانهای دیرکرد، نشریه پژوهشهای مهندسی صنایع درسیستمهای تولید، سال نهم، شماره 19، صفحه 107-123.
- -de-Alba, H. Nucamendi-Guillén, S. and Avalos-Rosales, O. ( 2022). A mixed integer formulation and an efficient metaheuristic for the unrelated parallel machine scheduling problem: Total tardiness minimization. EURO Journal on Computational Optimization, Volume 10, 100034. https://doi.org/10.1016/j.ejco.2022.100034
- Alencar Rolim, G., Seido Nagano, M., Prata, B., ( 2023). Formulations and an adaptive large neighborhood search for just-in-time scheduling of unrelated parallel machines with a common due window. Computers & Operations Research, Volume 153,106159. https://doi.org/10.1016/j.cor.2023.106159
- Maecker, S., Shen, L., Mönch, L., (2023). Unrelated parallel machine scheduling with eligibility constraints and delivery times to minimize total weighted tardiness. Computers & Operations Research,Volume 149,105999 https://doi.org/10.1016/j.cor.2022.105999
- Alizadeh Foroutan, R., Shafipour, M., Rezaeian, J., Khojasteh, Y., (2024). Just-in-time scheduling of unrelated parallel machines with family setups and soft time window constraints. Journal of Industrial and Production Engineering, 1–24. https://doi.org/10.1080/21681015.2024.2361046
- Li, K., Xu, L., Zhang, H., Chen, J., (2024). A genetic algorithm for fuzzy identical parallel machine scheduling of minimising total weighted tardiness under resource constraint. International Journal of Production Research, 1–25. https://doi.org/10.1080/00207543.2024.2323065
- Williams TM(1984). "Special products and uncertainty in production/inventorysystems". EJOR.,Vol.15.,PP.46-54. https://doi.org/10.1016/0377-2217(84)90047-X
- باقرینژاد، جعفر. قهقایی، آرزو (1395). تحلیل سیستم تولیدی MTS/MTO با مدلسازی صف مبتنیبر رویکرد گروهی پواسون و سرویس ارلنگ، نشریه پژوهشهای مهندسی صنایع درسیستمهای تولید، سال چهارم، شماره هفتم، صفحه 69-79.
- Zhang, T., Zhang, Y. J., Zheng, Q. P., & Pardalos, P. M. (2011). "A hybrid particle swarm optimization and tabu search algorithm for order planning problems of steel factory based on the make-to-stock and make-to-order management architecture". Journal of Industrial and Management Optimization,. Vol.7(1),PP. 31–51. https://doi.org/10.3934/jimo.2011.7.31
- Zhang, T., p. Zheng, Q., Fang, Y,. Zhang, Y., ( 2015). "Multi-level inventory matching and order planning under the hybrid Make- To- Order/ Make- To- Stock production environment for steel plants via Particle Swarm Optimization". Computers & Industrial Engineering. Vol. 87., PP. 238-249. https://doi.org/10.1016/j.cie.2015.05.001
- Danilczuk,W., Gola, A., Grznar, P. ( 2022). Job Scheduling Algorithm for a Hybrid MTO-MTS Production Process, IFAC-PapersOnLineVolume 55, Pages 451-456 https://doi.org/10.1016/j.ifacol.2022.04.235
- Abdollahpour,S., Rezaeian, J.,( 2016). Switching decisions in a hybrid MTS/MTO production system comprising multiple machines considering setup, Soft Comput DOI 10.1007/s00500-016-2185-z.
- Yano, Sh., Nagasawa, K., Morikawa, K. Takahashi, K., ( 2019). A Dynamic Switching Policy with Thresholds of Inventory Level and Waiting Orders for MTS/MTO Hybrid Production Systems, Procedia Manufacturing Volume 39, Pages 1076-1081. https://doi.org/10.1016/j.promfg.2020.01.367
- Sato, S., Maeda, H.,( 2023). Two new meta-heuristics for no-wait flexible flow shop scheduling problem with capacitated machines, mixed make- to- order and make- to- stock policy, International Journal of Production EconomicsVolume 263, 108877
- امامی، سعید. صباغ، محمد سعید. مصلحی، قاسم. حجازی، سیدرضا (1394). مسأله یکپارچه پذیرش سفارش و زمانبندی با ماشینهای موازی متفاوت در سیستم ساخت براساس سفارش، نشریه پژوهشهای مهندسی صنایع درسیستمهای تولید، شماره چهارم، جلد 26، صفحه 431-414.
- Wang, Zh., Qi, Y., Cui, H., Zhang, J., ( 2019). A hybrid algorithm for order acceptance and scheduling problem in make-to-stock/make-to-order industries, Computers & Industrial Engineering Volume 127, Pages 841-852. https://doi.org/10.1016/j.cie.2018.11.021
- Kusuma, P. D. (2022). Hybrid make-to-stock and make-to-order (mts-mto) scheduling model in multi-product production system. International Journal of Integrated Engineering, 14(4), 188-200. https://doi.org/10.30880/ijie.2022.14.04.014
- Chen, C., Han, J., Liu, Z., & Tiong, R. L. K. (2023). Flow shop scheduling of hybrid make-to-stock and make-to-order in a distributed precast concrete production system. Cleaner Logistics and Supply Chain, 7, 100106. https://doi.org/10.1016/j.clscn.2023.100106
- Wang, Sh., Wu, R., Chu, F., Yu, J., ( 2023). An exact decomposition method for unrelated parallel machine scheduling with order acceptance and setup times, Computers & Industrial Engineering,Vol 175, 108899 https://doi.org/10.1016/j.cie.2022.108899
- Kim, E. (2024). Inventory rationing, admission control, and production capacity allocation in a make‐to‐stock/make‐to‐ordermanufacturing system. International Transactions in Operational Research. https://doi.org/10.1111/itor.13521
- Li, Y., Tang, L., Bai, D., C. Coelho, L., ( 2024). Profit maximization through integrated order acceptance and scheduling: A metaheuristic approach, Applied Soft Computing ,Vol 159, 111570 https://doi.org/10.1016/j.asoc.2024.111570
- Leung, J.Y.-T,(2008). Scheduling with processing set restrictions: a survey. International Journal of Production Economics, Vol.116, PP.251-262. https://doi.org/10.1016/j.ijpe.2008.09.003
- Baker, K.R. and G.D. Scudder,( 1990). Sequencing with Earliness and Tardiness Penalties: A Review. Operations Research,.Vol.38(1).,PP. 22-36. https://doi.org/10.1287/opre.38.1.22
- Arkin EM, Silverberg EL.( 1987). "Scheduling jobs with fixed start and finish times". Discrete Applied Mathematics, Vol. 18., PP.1–8. https://doi.org/10.1016/0166-218X(87)90037-0
|