- برزگری، هومن؛ عالم تبریز اکبر و قاسمی احمدرضا، (1397)، ارائه و تبیین مدل ریاضی مسأله زمانبندی پروژه چندمهارتی همزمان با برنامهریزی تولید منابع مصرفی، پنجمین کنفرانس ملی پژوهشهای کاربردی در مدیریت و حسابداری، تهران، انجمن مدیریت ایران
- Tavana, M., Abtahi, A. R., & Khalili-Damghani, K. (2014). A new multi-objective multi-mode model for solving preemptive time–cost–quality trade-off project scheduling problems. Expert Systems with Applications, 41(4), 1830-1846.
- Heldman, K. (2018). PMP: project management professional exam study guide. John Wiley & Sons.
- Scheiblich, M., Maftei, M., Just, V., & Studeny, M. (2017).DEVELOPING A PROJECT SCORECARD TO MEASURE THE PERFORMANCE OF PROJECT MANAGEMENT IN RELATION TO EFQM EXCELLENCE MODEL. Amfiteatru Economic, 19(11), 966-980.
- Bredillet, C., Tywoniak, S., & Tootoonchy, M. (2018). Exploring the dynamics of project management office and portfolio management co-evolution: A routine lens. International Journal of Project Management, 36(1), 27-42.
- Sanghera, P. (2019). Project Schedule Management. In CAPM® in Depth (pp. 173-220). Apress, Berkeley, CA.
- de Andrade, P. A., Martens, A., & Vanhoucke, M. (2019). Using real project schedule data to compare earned schedule and earned duration management project time forecasting capabilities. Automation in Construction, 99, 68-78.
- برکیان سرخابی، مهرداد، (1397)، ساختار منشور پروژه طبق استاندارد PMBOK در پروژههای عمرانی، دومین کنفرانس ملی مهندسی عمران، معماری با تأکید بر اشتغالزایی در صنعت ساختمان، تهران، دبیرخانه دائمی کنفرانس
- سرایی، محمد؛ قاهری سید علی و ابراهیم پور مریم، (1397)، ارائه یک روش مؤثر برای حل مسأله زمانبندی پروژههای فناوری اطلاعات با منابع محدود با استفاده از الگوریتم علف هرز (مطالعه موردی: اداره کل بندر و دریانوردی خرمشهر اداره فاوا)، کنفرانس بینالمللی برق، کامپیوتر و مکانیک ایران، تهران، دبیرخانه دائمی کنفرانس
- Fernandes, G., Pinto, E. B., Araújo, M., & Machado, R. J. (2018). The roles of a Programme and Project Management Office to support collaborative university–industry R&D. Total Quality Management & Business Excellence, 1-26.
- دانشآموز، فاطمه، فتاحی، پرویز، حسینی، سید محمدحسن. (1399). ارائه یک الگوریتم شاخهوکران برای حل مسأله زمانبندی تولید کارگاهی انعطافپذیر همراه با یک مرحلهی مونتاژ. نشریه پژوهشهای مهندسی صنایع در سیستمهای تولید, 8(17), 347-359. doi:10.22084/ier.2021.3927
- بهنامیان، جواد، کمیجانی، فاطمه. (1397). ارائه الگوریتم شاخه و برش برای حل مسأله زمانبندی تولید کارگاهی با استفاده از نامعادلات معتبر. نشریه پژوهشهای مهندسی صنایع در سیستمهای تولید، 6(13), 139-149. doi: 10.22084/ier.2019.15262.1707
- بنیهاشمی، سید علی و خلیل زاده، محمد و شهرکی، علیرضا و رستمی مال خلیفه، محسن،(1399)،ارزیابی کارایی زمانبندی و برنامهریزی پروژه: رویکرد تحلیل پوششی دادهها با خروجی نامطلوب، سیزدهمین کنفرانس بینالمللی انجمن ایرانی تحقیقدرعملیات، شاهرود
- ایمانی؛ دین محمد و عبودی؛ سید حسن، (1398)، مدلسازی چندپروژهای، چندهدفه با منابع تجدید ناپذیر فاسدشدنی، کنفرانس بینالمللی راهکارها و چالشهای مدیریت و مهندسی صنایع، تهران، شرکت همایش آروین البرز
- حسنی، سمانه و فلاح نژاد محمد صابر، (1398)، زمانبندی پروژه با منابع چندمهارتی با فعالیتهای متداخل و زنجیرهای جایگزین در شرایط عدم قطعیت، اولین کنفرانس بینالمللی توانمندسازی کسبوکارهای فناورانه و راهکارهای پیشرفت در تکنولوژی و مهندسی، تهران، شرکت همایش آروین البرز
- De Reyck B., Herroelen W., (2001), The multi-mode resource-constrained project scheduling problem with generalized precedence relations, European Journal of Operational Research,119, 538-556.
- Brucker P., Drexl A., Möhring R., Neumann K. Pesch E. (2003), Resource-constrained project scheduling: Notation, classification, models, and methods, European Journal of Operational Research, 112,3-41.
- Mika M., Waligóra G., Węglarz J., (2008), Tabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup times, European Journal of Operational Research, 187,1238-1250.
- Peteghem V.V., Vanhoucke M., (2010), A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem, European Journal of Operational Research, 201, 409-418.
- Wang L., Fang C., (2011), An effective shuffled frog-leaping algorithm for multi-mode resource-constrained project scheduling problem, Information Sciences, 181, 4804-4822.
- Kazemipoor, H., Tavakkoli-Moghaddam, R., Shahnazari-Shahrezaei, P., & Azaron, A. (2013). A differential evolution algorithm to solve multi-skilled project portfolio scheduling problems. The International Journal of Advanced Manufacturing Technology, 64(5-8), 1099-1111.
- Javanmard, S., Afshar-Nadjafi, B., & Niaki, S. T. A. (2017). Preemptive multi-skilled resource investment project scheduling problem: Mathematical modelling and solution approaches. Computers & Chemical Engineering, 96, 55-68.
- Ozceylan, E. (2016). A mathematical model using AHP priorities for soccer player selection: a case study. South African Journal of Industrial Engineering, 27(2), 190-205.
- Maenhout, B., & Vanhoucke, M. (2017). A resource type analysis of the integrated project scheduling and personnel staffing problem. Annals of Operations Research, 252(2), 407-433.
- Dabirian, S., Abbaspour, S., Khanzadi, M., & Ahmadi, M. (2019). Dynamic modelling of human resource allocation in construction projects. International Journal of Construction Management, 1-10.
- Dotsenko, N. (2019). Methodological provision of human resources management in a multi-project environment. Technology audit and production reserves, 1(2 (45)), 52-54.
- Rahmanniyay, F., Yu, A. J., & Seif, J. (2019). A multi-objective multi-stage stochastic model for project team formation under uncertainty in time requirements. Computers & Industrial Engineering, 132, 153-165.
- Garomsa, T., Agon, E. D. C., & Assefa, S. (2019). Concept of Value Engineering and Current Project Management Practice in Ethiopian Building Construction Projects. American Journal of Civil Engineering, 7(1), 1-8.
- Najafzad, H., Davari-Ardakani, H., & Nemati-Lafmejani, R. (2019). Multi-skill project scheduling problem under time-of-use electricity tariffs and shift differential payments. Energy, 168, 619-636.
- Chakrabortty, R. K., Abbasi, A., & Ryan, M. J. (2020). Multi-mode resource constrained project scheduling using modified variable neighborhood search heuristic. International Transactions in Operational Research, 27(1), 138-167.
- Abido, M. A., & Elazouni, A. (2021). Modified multi-objective evolutionary programming algorithm for solving project scheduling problems. Expert Systems with Applications, 183, 115338.
- Hajiaghaei-Keshteli, M., & Aminnayeri, M. (2013). Keshtel Algorithm (KA); a new optimization algorithm inspired by Keshtels’ feeding. In Proceeding in IEEE conference on industrial engineering and management systems (pp. 2249-2253).
- Chouhan, V. K., Khan, S. H., & Hajiaghaei-Keshteli, M. (2021). Metaheuristic approaches to design and address multi-echelon sugarcane closed-loop supply chain network. Soft Computing, 25(16), 11377-11404.
- Salehi-Amiri, A., Zahedi, A., Akbapour, N., & Hajiaghaei-Keshteli, M. (2021). Designing a sustainable closed-loop supply chain network for walnut industry. Renewable and Sustainable Energy Reviews, 141, 110821.
|